=== page 264 === 264 DAFMAN65-605V1 31 MARCH 2021 Engineering Change—An alteration in the configuration of a capital investment (including software) after formal establishment of its operational configuration baseline. Expired Appropriation—An appropriation which is no longer available for new obligations but has not been cancelled. During the expired period, an appropriation retains its original identification (agency prefix, FY integrity, and symbol) and is available for adjusting and liquidating obligations, including within-scope contract changes. Facility—A real property entity consisting of one or more of the following: a building, a structure, a utility system, pavement, and underlying land. (For DAF, it includes runways, taxiways, aprons, towers, docks, structural or installed training aids.) Facility Modernization—Includes the alteration of facilities solely to implement new or higher standards (including regulatory changes), to accommodate new functions, or to replace building components that typically last more than 50 years (such as the foundations and structural members). (For more information, see AFI 32-1020.) Facility Restoration—Includes repair and replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster (storm damage), fire, accident, or other causes. Facility Sustainment—This category of work provides resources for annual maintenance and scheduled repair activities to maintain the inventory of real property assets through its expected life. It includes regularly scheduled adjustments and inspections, preventative maintenance tasks, and emergency response and service calls for minor repairs. It also includes major repairs or replacement of facility components (usually accomplished by contract) that are expected to occur periodically throughout the facility life cycle. This work includes regular roof replacement, refinishing of wall surfaces, repairing and replacement of heating and cooling systems, replacing tile and carpeting, and similar type work. Not included is the repair or replacement of non-attached equipment or furniture or building components that typically last more than 50 years (such as foundations and structural members). Sustainment does not include restoration, modernization, environmental compliance, historical preservation, or costs related to unexpected events, which are funded elsewhere. (For further information, see AFI 32-1020.) First Destination Transportation (FDT)—Transportation required to effect the delivery of materiel from a procurement source (including DoD industrial activities that fabricate new material, but not if the industrial activity only reworks the item or component) outside the DoD supply system to the first point at which the DAF takes possession or ownership. In those cases where the DAF accepts a production item at the manufacturer plant, or source of production, and legally owns the item, FDT extends to the first point of delivery for either use or storage. It includes the charges for freight, cartage, and demurrage incurred incident to shipment of the materiel. Amplifications of this definition are as follows if materiel is: —Procured within the Continental United States, or overseas, for delivery to a Continental United States or overseas point of use or storage, FDT includes all transportation by land, air, and inland or coastal waterways, except that FDT terminates at the port of embarkation (Continental United States or overseas), when the item enters the Defense Transportation System. —Incident to a Headquarters USAF-approved package program (such as Distant Early Warning line, or Ballistic Missile Early Warning System) and provided to the contractor by the DAF for use or storage at an overseas location, FDT includes all transportation from point of origin of shipment to the point of use or storage, unless otherwise provided under the terms of the "package program." —Materiel