=== page 97 === DoD 7000.14-R Financial Management Regulation Volume 2B, Chapter 5 * September 2022 Exhibit R-3: RDT&E Project Cost Analysis (Continued) Exhibit R-3: RDT&E Project Cost Analysis A. General Instructions: 1. The R-3 exhibit is required for programs funded in budget activities 4 (Advanced Component Development and Prototypes), 5 (System Development and Demonstration), and 7 (Operational System Development) only. A separate R-3 exhibit must be prepared for each project in an applicable R-1 line item. 2. These exhibits must be printed on 8 1/2 by 11 inch paper in landscape format. Classified material must be submitted separately. 3. All funding within any R-exhibit will be expressed in millions, with three decimal places. B. Exhibit Instructions: 1. Identify the month and year of submission of the exhibit. If an Amended Budget is submitted, identify the date of the revised submission. 2. Appropriation Code (Treasury Account Symbol)/ and Name/Budget Activity Number and Title. Identify the appropriation and budget activity. This information must match the PRCP (R-1) lock position. 3. R-1 Item Nomenclature/Title (Program Element Name): Identify the name of the R-1 line item as identified in PRCP (R-1) lock position. This information must match the PRCP (R-1) lock position. 4. Program Element Number: The Program Element must be unique. An R-2 Exhibit with a Budget Activity Number that is different from the previous years should include PY and CY information within the current R-2 Exhibit. 5. Project Number and Nomenclature: Identify the project number and nomenclature as identified in PRCP (R-1) lock position. 6. Project Cost Categories. Cost information must be provided for each project regardless of funding amount, with project costs broken down into cost categories. Total of all project costs must equal the project funding for any funding years. Sample cost categories shown are typical of various types of defense research and development efforts. Costs must be distributed among categories in accordance with the project work breakdown structure (WBS) or other categories used by the project office in project execution. 5-20