=== page 437 === Appendix XII: The Cost Estimating Process and Internal Control Table 50 provides examples of how each of the 12 steps of the cost estimating process can be mapped to the five components of internal control. Table 50 is not intended to be definitive or exhaustive; rather, it provides potential relationships between deficiencies in project control and the entity’s internal control system. Table 50: Cost Estimating Steps Mapped to Selected Components and Principles of Internal Controls Cost estimating step Component Principle Control environment (3) Establish structure, responsibility, and authority Risk assessment 1 2 X X (4) Demonstrate commitment to competence X (5) Enforce accountability X (6) Define objectives and risk tolerances X 3 X 4 5 6 X (7) Identify, analyze, and respond to risks 7 X X 8 X X X X (9) Identify, analyze, and respond to change 10 11 X X X Control activities (10) Design control activities Information and communication (13) Use quality information Monitoring 9 X X X X X X X X X X X (14) Communicate internally X X X X X X X X X (15) Communicate externally X X X X X X (16) Perform monitoring activities X X X (17) Evaluate issues and remediate deficiencies 12 X X X X Source: GAO | GAO-20-195G Deficiencies in Design, Implementation, or Operating Effectiveness As described in Government Auditing Standards, auditors may consider different levels of internal control assessment depending on the objectives of the audit. These levels are (1) assessing the design, 2) assessing the design and implementation, or (3) assessing the design, implementation, and operating effectiveness of controls. 3 • The design of internal control is assessed by determining whether controls individually and in combination are capable of achieving an objective and addressing the related risk. A deficiency in design exists 3GAO, Government Auditing Standards, GAO-18-568G (Washington, D.C.: July 2018). Page 425 GAO-20-195G Cost Estimating and Assessment Guide