=== page 1 === Text as published on gao.gov, https://www.gao.gov/products/b-105555, archived 2026-07-10. GAO published no original file for this decision. Rendered by Comptroller Desk. B-105555 September 26, 1951 Number: B-105555 Date: 1951-09-26 B-105555 September 26, 1951 The Honorable The Secretary of the Army My dear Mr. Secretary: Reference is made to letter of September 11, 1951, from the Assistant Secretary of the Army, requesting an opinion as to whether certain unexpended balances in the appropriation "Government and Relief in Occupied Areas, 1950," may be used to complete the work begun under a contract executed in fiscal year 1950 but which has now been terminated for default. The contract in question covered the construction of a water system, bridges, and roads on the Island of Okinawa and was terminated on June 22, 1951, for failure on the part of the contractor to maintain progress on the work to be accomplished. It is stated that a subsequent contract has been negotiated with a Japanese firm to complete the water system portion of the contract and that there remains a balance of $1,366,391 in the 1950 appropriation which is available for the completion of the portion of work on roads and bridges under the original contract. It is explained, however, that efforts to obtain contracts for the roads and bridges portion of the basic contract have resulted in the receipt of quotations three times the price of the original contract price and considerable above the Governments estimates based on present costs. Consequently, it has been administratively determined that the work can be performed at the lowest expense to the Government by permitting the District Engineer to proceed on a labor-account basis. It is stated further that-"In carrying to completion that portion of roads and bridges contracted for under the original contract, it is estimated that an additional $1,515,000 does not increase the scope of the work scheduled under the original contract, but is required because of changes in specifications, increased quantity of materials and higher prices. Changes in specifications are necessitated because recent experience has shown that climatic conditions in Okinawa require deeper sub-surface for roads than originally planned in order to develop good and permanent surfaces. This, in turn, requires a greater quantity of material throughout the construction with a corresponding increase in cost." In view of the circumstances described above, the Assistant Secretary requests a decision on the following questions: Page 1 of 2