=== page 1 === Text as published on gao.gov, https://www.gao.gov/products/b-134138, archived 2026-09-01. GAO published no original file for this decision. Rendered by Comptroller Desk. B-134138, Jul. 21, 1958 Number: B-134138 Date: 1958-07-21 B-134138, JUL. 21, 1958 TO THE SECRETARY OF AGRICULTURE: REFERENCE IS MADE TO OUR LETTERS OF OCTOBER 28, 1957, AND APRIL 14, 1958 (B-134138), TO YOU, CONCERNING A LOAN OF $11,173,000 MADE BY THE RURAL ELECTRIFICATION ADMINISTRATION (REA) TO THE CENTRAL IOWA POWER COOPERATIVE (CIPCO), PART OF THE PROCEEDS ($120,000) OF WHICH WAS TO BE USED TO ENABLE CIPCO TO FURNISH POWER TO A MEMBER COOPERATIVE FOR RESALE BY THE MEMBER TO LEHIGH SEWER PIPE AND TILE COMPANY (LEHIGH), LEHIGH, IOWA. THE RECORD BEFORE US DISCLOSES THAT THE LOAN IN QUESTION WAS APPROVED BY THE ACTING ADMINISTRATOR, RURAL ELECTRIFICATION ADMINISTRATION ON SEPTEMBER 9, 1955, FOR THE PURPOSE OF FINANCING THE CONSTRUCTION BY CIPCO OF CERTAIN ELECTRIC GENERATION AND TRANSMISSION FACILITIES INCLUDING ONE 44,000 KW GENERATING UNIT, 128 MILES OF 115 KV TRANSMISSION LINE, 176.5 MILES OF 34.5 KV TRANSMISSION LINE, AND RELATED SUBSTATION AND SWITCHING FACILITIES, FOR THE PURPOSE OF FURNISHING ELECTRIC ENERGY TO CIPCO'S EIGHT REA-FINANCED MEMBER COOPERATIVES. INCLUDED IN THE 176.5 MILES OF 34.5 KV TRANSMISSION LINE WERE 20 MILES DESIGNATED THE "LEHIGH TAP," THE PURPOSE OF WHICH WAS TO ENABLE CIPCO TO FURNISH ONE OF ITS MEMBER COOPERATIVES, GREENE COUNTY RURAL ELECTRIFICATION COOPERATIVE (GREENE COUNTY), A SUPPLY OF POWER FOR A LARGE POWER LEAD IN THE VICINITY OF LEHIGH, IOWA. THE LARGE POWER LOAD NEEDED IN THE VICINITY OF LEHIGH APPARENTLY WAS FOR A NEW BUILDING OR PLANT THAT LEHIGH PROPOSED TO CONSTRUCT NEAR AN EXISTING PLANT IT OWNED. THE COST OF THIS 20 MILES OF LINE WAS ESTIMATED AT $120,000. YOUR DEPARTMENT, BY LETTER DATED DECEMBER 3, 1957, ADVISED US THAT THE LOAN WAS MADE PURSUANT TO THE RURAL ELECTRIFICATION ACT OF 1936, AS AMENDED, 7 U.S.C. 901-924, AND IN ACCORDANCE WITH THE ADMINISTRATIVE FINDINGS REQUIRED BY SECTION 4 OF THAT ACT (7 U.S.C. 904). THIS LATTER CODE SECTION PROVIDES, IN PERTINENT PART, AS FOLLOWS: "THE ADMINISTRATOR IS AUTHORIZED AND EMPOWERED * * * TO MAKE LOANS FOR RURAL ELECTRIFICATION * * * FOR THE PURPOSE OF FINANCING THE CONSTRUCTION AND OPERATION OF GENERATING PLANTS, ELECTRIC TRANSMISSION AND DISTRIBUTION LINES OR SYSTEMS FOR THE FURNISHING OF ELECTRIC ENERGY TO PERSONS IN RURAL AREAS WHO ARE NOT RECEIVING CENTRAL STATION SERVICE * * *.' SECTION 2 OF THE SAME ACT (7 U.S.C. 902) ALSO CONTAINS AN UNSERVED PERSON OR CENTRAL STATION SERVICE LIMITATION. THE RECORD DISCLOSES THAT A PLANT OF LEHIGH LOCATED ON A TRACT OF GROUND OUTSIDE THE TOWN OF LEHIGH, IOWA, WAS BEING FURNISHED 25-CYCLE ELECTRIC SERVICE BY THE Page 1 of 6