B-226572, Jun 25, 1987

GAO · Comptroller General Decision B-226572

1. AUBURN DAM AND RESERVOIR WAS AUTHORIZED UNDER PUB.L. NO. 89-161, 79 STAT. 615, IN 1965 AS PART OF THE AUBURN-FOLSOM SOUTH UNIT OF THE CENTRAL VALLEY PROJECT, CALIFORNIA. THE BUREAU OF RECLAMATION OF THE DEPARTMENT OF THE INTERIOR IS NOW CONSIDERING ALTERNATIVES TO CONSTRUCTING AUBURN DAM AND RESERVOIR AS ORIGINALLY AUTHORIZED. A SUBSTANTIAL REDUCTION IN RESERVOIR CAPACITY WOULD REQUIRE NEW STATUTORY AUTHORITY. AN ACCOMPANYING CHANGE IN THE PRINCIPAL PURPOSE OF THE UNIT FROM IRRIGATION WATER SUPPLY TO FLOOD CONTROL SHOULD ALSO BE MADE AS PART OF THE NEW AUTHORITY.