GAO decisions
Kenneth Bellamy
GAO · Comptroller General Decision B-261639
1. A transferred employee purchased a lot near his new duty station, settled on it, and then constructed a residence, but final settlement on the residence occurred after the third anniversary of the date the employee reported for duty. The employee requests that the 3-year time limit in sec. 302-6.1(e), Federal Travel Regulation (FTR), be waived because litigation between the contractor and the employee caused the delay. Since the provisions of the FTR have the force and effect of law, this Office is without authority to modify or waive those requirements.
Original file
Document preview
Preview too small? Open the PDF in a new tab
4-page PDF. Opens in your phone's PDF viewer, where you can zoom and search.
Open PDFPage text is available through the page text route, using the page number in place of 1. Extracted text may omit content. The original file governs.